Libya’s Arabian Gulf Oil Company (AGOCO) reported today that its G105 well in the Nafura field returned to work after completing comprehensive maintenance work.
This included replacing the old corroded and deposited line (Scale) with a new line with a diameter of 6 inches and a length of 700 meters, which contributes to improving the flow of production and ensuring its continuity.
AGOCO said G105 well is one of the wells producing Terminal 4, which is expected to reduce breakdowns and leaks and increase the operational life of the well.
The company said this comes as part of its efforts to enhance production efficiency and sustainability, and that the achievement reflects its commitment to improve infrastructure and enhance the sustainability of production in accordance with the highest standards of safety and quality.