Zueitina Oil Company reported today that work has resumed on its Low-Pressure Gas Compressor project at Field 103A, which had been stalled since 2011. This project is part of its plan to revive strategic projects and develop its operational infrastructure.
The company said the project aims to support the associated gas processing and utilization system by re-compressing it and utilizing it in operational processes. This will contribute to increased efficiency, reduced losses, and improved stability of the production system, in addition to reducing emissions and protecting the environment.
The resumption of work on this project is a significant technical step that reflects the ability of national personnel to complete vital projects and develop the company’s production facilities despite all challenges.






