By Libya Herald staff.
Tripoli, 8 December 2014:
Mellitah Oil and Gas Company has announced a tender for oil spill recovery at a . . .[restrict]heating station along the pipeline connecting the Rimal station with the Abu Attifel field.
The work includes carrying out all operations and activities required for maximum recovery of the crude oil spilled at an intermediate heating station located approximately 50 km from Abu Attifel field, and injecting the recovered hydrocarbon back into the crude oil pipeline.
The work also includes remediation of oil-contaminated soil and the reclamation of the contaminated site in a manner compatible with the surrounding landscape.
All documents have to be submitted no later than 23 December 2015.
More information about qualification requirements can be found at http://noc.ly/index.php/en/tenders-2/664-mellitah-oil-gas-tender-no781. [/restrict]